Ada County HD, ID
Home MenuInspections
The documents provided on this page are intended for contractors performing work within ACHD's right-of-way. Documents may include forms, templates, and reference materials. Contractors should review all materials carefully to ensure current requirements are met.
If a document is not listed, please visit the Popular Forms page or contact ACHD at (208)387-6100.
Contractor Resources:
Approved Materials List (Excel Document)
- Approved Materials - Concrete (PDF)
- Approved Materials - Asphalt (PDF)
- Approved Materials - Sub & Base (PDF)
ACHD Standard Traffic Control Templates
ACHD'S 2017 Supplemental Specifications to the 2017 ISPWC Manual
ACHD's QA/QC Supplemental Specifications
Interim Guidance - Cold Mix Asphalt Patching
Section 6000: Construction, Permits and Inspections
- 6001 - Definitions
- 6002 - Scope and Responsibility
- 6003 - Standards and Specifications
- 6004 - Permit and Subdivision Inspection
- 6005 - Sidewalk
- 6006 - Five Year Moratorium
- 6007 - Temporary Highway Use Permits (Resolution 549, 1/1/99)
Section 8200: Stormwater Design Manual
