Ada County Highway District

2012 Overlays (Road Resurfacing)

General Description:

Construction on the 2012 Overlays began in early May and wrapped up in fall 2012.

Locations and approximate time frames are listed below. Please check back as the list of road segments will be added to and updates to construction schedules will be made, as schedules are impacted by weather and subject to change. If you have questions, please call (208) 387-6100.

See the RITA page to view all "Road Work in the Area" happening this week.

 

What is an overlay?

Each year the condition of roads throughout Ada County is closely assessed and a priority system is used to determine which roads have the greatest need for re-surfacing. Overlay work generally involves the milling and removal of two inches of existing (failed) asphalt. A fresh layer of asphalt is then applied to the roadway, which will also receive new lane markings. The road segments selected are based on an in-depth ranking system that accounts for wear and deterioration. Pedestrian sidewalk ramps located along the overlay road sections will be removed and replaced if they are not in compliance with Americans with Disability Act (ADA) standards.

Impacts During Construction

Overlay work is typically a fast moving process, but includes several steps, some of which can involve, but are not limited to:

  • General construction noise
  • Ground vibration
  • Equipment safety back up alarms
  • Dust
  • Night work lighting
  • Temporary lane restrictions & delays
  • Pedestrian impacts (sidewalk ramps not compliant with Americans with Disabilities Act (ADA) standards will be removed and replaced)
  • Reduced speeds
  • Flaggers directing traffic
  • Jackhammering around utility manholes in roadways and on pedestrian ramps
  • Uneven driving surface

Some overlay locations are scheduled for night work to occur, typically between the hours of 7 p.m. and 5 a.m. Performing night work allows construction to occur faster and under safer conditions for residents, motorists and crews and reduces the need for lane restrictions or closures.

Overlay Locations

Phase 1 - Complete
Construction: Early May - Late June
Estimated construction cost: $887,000
 

  • Orchard Street, Gowen Road to Wright Street - complete
  • Five Mile Road, McMillan Road to Treeline Street - complete
  • Northview Street, Cole Road to Curtis Road - complete

*Time frames are subject to change. Some steps involved in the overlay process cannot be done under wet weather conditions. 

Phase 2: Overlay work on the following segments is anticipated to begin July 17th and be complete in early September - timeframes are subject to change:
(last updated 10/25/2012)

  • Spectrum Street, Entertainment Avenue to Cole Road - complete
    • Day Work - 7:30 a.m. to 5:30 p.m.
  • Entertainment Avenue, Spectrum Street to Overland Road - complete 
    • Day Work - 7:30 a.m. to 5:30 p.m. 
  • Overland Road, Spectrum Street to Cole Road - complete
    • Day Work - 9 a.m. to 4 p.m. and 6 p.m. to 10 p.m.
  • Milwaukee Street, Franklin Road to Fairview Avenue - complete
    • Pedestrian ramp work during day hours - Road work during night hours - 9 p.m. to 7 a.m. (weekdays) and 9 p.m. to 9 a.m. (weekends) 
  • Milwaukee Street, Fairview Avenue to Ustick Road - complete
    • Day Work - 9 a.m. to 4 p.m. and 6 p.m. to 10 p.m.

Phase 3: Overlay work on the following segments is anticipated to begin after July 30th and be complete in mid-September - timeframes are subject to change:
(last updated 10/25/2012)

  • Fairview Avenue, Garden Street to 16th Street - complete
    • Day work - 9 a.m. to 4 p.m. and 6 p.m. to 10 p.m.
  • Shoreline Drive, 13th Street to Main Street - complete
    • Day work - 9 a.m. to 4 p.m. and 6 p.m. to 10 p.m.
  • Americana Boulevard, Shoreline Street to Front Street - complete
    • Day work - 9 a.m. to 4 p.m. and 6 p.m. to 10 p.m.
  • 15th Street, Shoreline Drive to Front Street - complete
    • Day work - 9 a.m. to 4 p.m. and 6 p.m. to 10 p.m.

Phase 4: Overlay work on the following segments is anticipated to begin in early August and be complete in October - timeframes are subject to change:
(last updated 10/25/2012)

  • Cole Road, Court Avenue to Mountain View Drive - complete
    • Day work - 9 a.m. to 4 p.m. and 6 p.m. to 10 p.m.
  • Main Street, Garden Street to 17th Street - complete
    • Day work - 9 a.m. to 4 p.m. and 6 p.m. to 10 p.m.
  • Orchard Street, Overland Road to Franklin Road - complete
    • Day work - 9 a.m. to 4 p.m. and 6 p.m. to 10 p.m.

2013 Federal Aid Overlays
Work anticipated for May/June 2013. Additional locations to be added.

  • Lake Forest Drive, Quamash Way to Summersweet Drive
  • McMillan Road, Five Mile Road to Mitchell Street
  • McMillan Road, Ten Mile Road to Meridian Road
  • Bergeson Street, Federal Way to Apple Street
  • Maple Grove Road, Victory Road to Targee Street
  • Maple Grove Road, Targee Street to Overland Road

 

Time Frame

Start Date:
Early May 2012
End Date:
October 2012

Return to Projects