Construction update as of 11/30/17:  The Preconstruction Meeting was held November 13. The Notice to Proceed is scheduled for December 5. Utility work by Suez Water started November 27th.

 

General Description:

Project Description:

  • Replace Bridge #1486 over the Boise Valley Canal
  • Replace the State Street and 15th Street intersection with concrete pavement
  • Install "Green" stormwater infrastructure
  • This project will be constructed at the same time as the 2018 Downtown Boise Implementation Plan project

 

Time Frame

Start Date:
Winter 2017
End Date:  Spring 2018

 