General Description:
ACHD will replace bridge #1319 on 34th Street. Work includes replacing the existing corrugated metal pipe that is corroding with a new concrete box culvert. The project also includes building a new sidewalk on the east side of 34th Street. During construction, 34th Street south of Forsythia Drive will be closed. Construction is planned to begin in mid-January 2019.
Brian McCarthy
projects@achdidaho.org