2017 Cul-De-Sac Project

General Description

2017 Cul-De-Sac Project

Project Purpose:  Maintain and protect the asphalt from moisture penetration, improve skid resistance and extend the life of the asphalt surface.  

Process:  A slurry seal will be applied to the surface of the asphalt. Slurry seal is a mixture of fine aggregate, latex-emulsified asphalt, and water.

Time Frame

Start Date: End of March 2017
End Date: End of June 2017