State Street Bridge #1486 (#536) at 15th Street

General Description

State Street Bridge #1486 (#536) at 15th Street

Project Description:

  • Replace Bridge #1486 over the Boise Valley Canal
  • Replace the State Street and 15th Street intersection with concrete pavement
  • Install "Green" stormwater infrastructure
  • This project will be constructed at the same time as the 2018 Downtown Boise Implementation Plan project

Time Frame

Start Date: Winter 2017
End Date: TBD