President Drive, Executive Drive to Meadowland Drive

General Description

This project is substantially complete as of 9/28/16.

Project Description:

  • Construct attached sidewalk to the north side of President Drive between Executive Drive and Meadowland Drive. Some valley gutters will also be replaced with curb and gutter.
Project Purpose:

  • The addition of sidewalks will provide pedestrian connectivity for students attending Lewis and Clark Middle School. This project came about as a result of the request of the West Ada School District.

Time Frame

Start Date: Summer 2016
End Date: Fall 2016