State Street, Glenwood Street to Collister Drive

General Description

Project update as of 5/9/16:  The Preconstruction Meeting was held on May 6. The Notice to Proceed has been adjusted to May 16.

The Ada County Highway District (ACHD) is beginning the design development to construct sidewalk and improve pedestrian ramps on both sides of State Street between Glenwood Street and Collister Drive. 

The goal of the project is to provide continuous five-foot-wide sidewalks on both sides of the two mile stretch of State Street and improve pedestrian ramps. The project will assess the existing sidewalk and pedestrian ramps to verify their compliance with the American with Disabilities Act (ADA). Existing sidewalks and pedestrian ramps that are compliant with the ADA will be retained to the extent possible. The future expansion of State Street will be accommodated where possible.

The project takes into account the State Street Alignment Study between Glenwood Street and 23rd Street.

Project Time Line:

Concept Design/Design - Fall/Winter 2013
Right-of-Way Acquisition - 2015
Construction - 2017

Time Frame

Start Date: Construction, 2017
End Date: TBD